Navigation

Please note: This is a demo version and only the dark grey sections are available.

  • 1.1 HSDPA (High Speed Downlink Packet Access) for WCDMA
  • 1.2 HSDPA Targets with Regards to Rel. ‘99
  • 1.3 HSDPA Characteristics
    • 1.3.1 Hybrid ARQ Techniques – Link Adaptation
    • 1.3.2 IR Memory and Stop & Wait Machines
  • 1.4 Important Changes with HSDPA
    • 1.4.1 New Channels with HSDP
    • 1.4.2 UE Category’s – HSDPA Physical Capability
    • 1.4.3 Multicode Operation in HSDPA
  • 1.5 HSDPA Basic Operation
    • 1.5.1 HSDPA Control Plane
    • 1.5.2 HSDPA User Plane without MAC-c/sh
    • 1.5.3 HSDPA Control and User Plane Extensions
    • 1.5.4 HSDPA and DPCH Operation – HSDPA Setup
    • 1.5.5 HSDPA Transmission and Retransmission
  • 1.6 Introduction to HSDPA Mobility Procedures
    • 1.6.1 Best Serving HS-DSCH Cell Measurement
    • 1.6.2 Intra NodeB Synchronized HS-DSCH Cell Change Procedure
    • 1.6.3 Inter NodeB HS-DSCH Cell Change – Hard Handover (1)
    • 1.6.4 Inter NodeB HS-DSCH Cell Change – Hard Handover (2)
  • 2.1 The High-Speed Roadmap
    • 2.1.1 HSUPA Targets
  • 2.2 HSUPA Characteristics – Scaling of TBS
    • 2.2.1 Comparison of new HSUPA Features and retained Rel. ’99 Features
  • 2.3 Basic HSUPA Operation
    • 2.3.1 New Channels with HSUPA
    • 2.3.2 Principle Operation of Absolute Grant
    • 2.3.3 Absolute Grants and Relative Grants – RLS versus Non-RL’s
    • 2.3.4 Sharing of UL-Resources in HSUPA
    • 2.3.5 Overview on N-Stop & Wait Scheme
  • 2.4 Achievable Throughput Rates in HSUPA
  • 2.5 HSPA PS Protocol Stack
    • 2.5.1 Details on HSUPA Protocol Stack
    • 2.5.2 Details on HSDPA Protocol Stack
    • 2.5.3 Impact of HSUPA’s SHO on RAN Architecture
    • 2.5.4 Basic Operation of MAC-e/es with SG
    • 2.5.5 Transport Channel Type Switching with HSUPA
  • 2.6 HSUPA and DPCH Operation – HSUPA Setup
    • 2.6.1 RRC and NAS Signaling for E-DCH Setup
      • 2.6.1.1 RRC Connection Establishment Procedure
      • 2.6.1.2 GMM Service Request & Activate PDP Context Request
      • 2.6.1.3 RAB Assignment and Radio Bearer Setup
      • 2.6.1.4 Activate PDP Context Accept
    • 2.6.2 E-DCH / HS-DSCH Serving Cell Change – E1D

 

«« prev «« blank.gif Start blank.gif »» next »»

© INACON GmbH 1999 - 2009. All rights reserved. Reproduction and/or unauthorized use of this material is prohibited
and will be prosecuted to the full extent of German and international laws.